DAFTAR ANALISA PEKERJAAN |
SNI.DT
91-0009-2007 |
PEKERJAAN DINDING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.1 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding bata merah
tebal 1 bata, campuran spesi 1 PC: 2PP |
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Bata merah |
bh |
140.000 |
Rp. |
800.00 |
Rp. |
|
Rp. |
112,000.00 |
Rp. |
|
|
Semen portland |
kg |
43.500 |
Rp. |
1,100.00 |
Rp. |
|
Rp. |
47,850.00 |
Rp. |
|
|
Pasir pasang |
m3 |
0.080 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
7,200.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.600 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
30,000.00 |
|
Tukang batu |
Oh |
0.200 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
14,400.00 |
|
Kepala Tukang |
Oh |
0.020 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
1,600.00 |
|
Mandor |
Oh |
0.030 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
2,160.00 |
|
|
|
|
|
|
|
|
|
|
167,050.00 |
|
48,160.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
215,210.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
215,210.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.2 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding bata merah
tebal 1 bata, campuran spesi 1 PC: 3PP |
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Bata merah |
bh |
140.000 |
Rp. |
800.00 |
Rp. |
|
Rp. |
112,000.00 |
Rp. |
|
|
Semen portland |
kg |
32.950 |
Rp. |
1,100.00 |
Rp. |
|
Rp. |
36,245.00 |
Rp. |
|
|
Pasir pasang |
m3 |
0.091 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
8,190.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.600 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
30,000.00 |
|
Tukang batu |
Oh |
0.200 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
14,400.00 |
|
Kepala Tukang |
Oh |
0.020 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
1,600.00 |
|
Mandor |
Oh |
0.030 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
2,160.00 |
|
|
|
|
|
|
|
|
|
|
156,435.00 |
|
48,160.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
204,595.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
204,600.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.3 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding bata merah
tebal 1 bata, campuran spesi 1 PC: 4PP |
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Bata merah |
bh |
140.000 |
Rp. |
800.00 |
Rp. |
|
Rp. |
112,000.00 |
Rp. |
|
|
Semen portland |
kg |
26.550 |
Rp. |
1,100.00 |
|
|
Rp. |
29,205.00 |
|
|
|
Pasir pasang |
m3 |
0.093 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
8,370.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.600 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
30,000.00 |
|
Tukang Batu |
Oh |
0.200 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
14,400.00 |
|
Kepala Tukang |
Oh |
0.020 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
1,600.00 |
|
Mandor |
Oh |
0.030 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
2,160.00 |
|
|
|
|
|
|
|
|
|
|
149,575.00 |
|
48,160.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
197,735.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
197,740.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.7 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding bata merah
tebal 1/2 bata, campuran spesi 1 PC: 2PP |
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Bata merah |
bh |
70.000 |
Rp. |
800.00 |
Rp. |
|
Rp. |
56,000.00 |
Rp. |
|
|
Semen portland |
kg |
18.950 |
Rp. |
1,100.00 |
Rp. |
|
Rp. |
20,845.00 |
Rp. |
|
|
Pasir pasang |
m3 |
0.038 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
3,420.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.300 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
15,000.00 |
|
Tukang batu |
Oh |
0.100 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
7,200.00 |
|
Kepala Tukang |
Oh |
0.010 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
800.00 |
|
Mandor |
Oh |
0.015 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
1,080.00 |
|
|
|
|
|
|
|
|
|
|
80,265.00 |
|
24,080.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
104,345.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
104,350.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.8 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding bata merah
tebal 1/2 bata, campuran spesi 1 PC: 3PP |
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Bata merah |
bh |
70.000 |
Rp. |
800.00 |
Rp. |
|
Rp. |
56,000.00 |
Rp. |
|
|
Semen portland |
kg |
14.370 |
Rp. |
1,100.00 |
Rp. |
|
Rp. |
15,807.00 |
Rp. |
|
|
Pasir pasang |
m3 |
0.040 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
3,600.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.300 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
15,000.00 |
|
Tukang batu |
Oh |
0.100 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
7,200.00 |
|
Kepala Tukang |
Oh |
0.010 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
800.00 |
|
Mandor |
Oh |
0.015 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
1,080.00 |
|
|
|
|
|
|
|
|
|
|
75,407.00 |
|
24,080.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
99,487.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
99,490.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.9 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding bata merah
tebal 1/2 bata, campuran spesi 1 PC: 4PP |
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Bata merah |
bh |
70.000 |
Rp. |
800.00 |
Rp. |
|
Rp. |
56,000.00 |
Rp. |
|
|
Semen portland |
kg |
11.500 |
Rp. |
1,100.00 |
Rp. |
|
Rp. |
12,650.00 |
Rp. |
|
|
Pasir pasang |
m3 |
0.043 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
3,870.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.300 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
15,000.00 |
|
Tukang batu |
Oh |
0.100 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
7,200.00 |
|
Kepala Tukang |
Oh |
0.010 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
800.00 |
|
Mandor |
Oh |
0.015 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
1,080.00 |
|
|
|
|
|
|
|
|
|
|
72,520.00 |
|
24,080.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
96,600.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
96,600.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SNI.DT 91-0009-2007.6.23 |
|
|
|
|
|
|
|
|
|
|
|
Memasang 1 m2 dinding terawang campuran spesi 1 PC: 4PP |
|
|
|
|
|
|
|
Kebutuhan |
Satuan |
Indeks |
Harga satuan |
Harga satuan |
Jumlah harga bahan |
Jumlah harga upah |
|
Bahan |
Batu kerawang |
bh |
30.000 |
Rp. |
4,000.00 |
Rp. |
|
Rp. |
120,000.00 |
Rp. |
|
|
Semen portland |
kg |
11.000 |
Rp. |
1,100.00 |
Rp. |
|
Rp. |
12,100.00 |
Rp. |
|
|
Pasir pasang |
m3 |
0.035 |
Rp. |
90,000.00 |
Rp. |
|
Rp. |
3,150.00 |
Rp. |
|
|
Tenaga |
Pekerja |
Oh |
0.300 |
Rp. |
|
Rp. |
50,000.00 |
Rp. |
|
Rp. |
15,000.00 |
|
Tukang batu |
Oh |
0.100 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
7,200.00 |
|
Kepala Tukang |
Oh |
0.010 |
Rp. |
|
Rp. |
80,000.00 |
Rp. |
|
Rp. |
800.00 |
|
Mandor |
Oh |
0.015 |
Rp. |
|
Rp. |
72,000.00 |
Rp. |
|
Rp. |
1,080.00 |
|
|
|
|
|
|
|
|
|
|
135,250.00 |
|
24,080.00 |
|
|
|
|
|
|
|
|
Jumlah harga = |
|
Rp. |
159,330.00 |
|
|
|
|
|
|
|
|
Pembulatan
= |
|
Rp. |
159,330.00 |
No comments:
Post a Comment